Asset Management

Welcome to the Innovyze Asset Management feedback page.
This forum is the place to hear your ideas, feature suggestions, and feedback about our Asset Management Products and Solutions.  For more information about these offerings, please visit: https://www.innovyze.com/en-us/products/infoasset-overview

Please note that your ideas and comments posted here are visible to all other users.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. As an organization, we would like the ability to choose an alternative final risk calculation method.

    So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model.

    It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.

    10 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Criticality  ·  Flag idea as inappropriate…  ·  Admin →
  2. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    6 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  3. InfoAsset Planner - Allow Re-Ordering of Items in Operation Center

    Allow items in the Operation Center to be reordered; COFs, LOFs, Risks, Data Miners, etc.

    6 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

    The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP model reports the survival probability from the last break but not the time to the next break.

    4 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Asset Failure  ·  Flag idea as inappropriate…  ·  Admin →
  5. user defined boolean fields

    Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. Project Prioritization: Include multiple asset types in a single project

    Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. Basically Project Prioritization across asset types.

    Suggested by CDM Smith and others....

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financial Planning  ·  Flag idea as inappropriate…  ·  Admin →
  7. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  8. InfoAsset Planner for ArcGIS Pro

    As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  1 comment  ·  GIS  ·  Flag idea as inappropriate…  ·  Admin →
  9. InfoAsset Planner - Validate Existence of CCTV Video Files

    I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys.

    I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since the video name in the .xml file does not match the saved video. A way to select CCTV surveys referencing invalid CCTV video files would be very helpful.

    This might be something that needs to be pre-processed on the InfoAsset Manager side of things but would be nice if InfoAsset Planner users could run the…

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Video Management  ·  Flag idea as inappropriate…  ·  Admin →
  10. InfoAsset Planner - Allow Renaming of Data Miners

    Allow Data Miners to be renamed in Data Miner.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  11. View model results in InfoAsset Manager

    As a user I would like to be able to see hydraulic model results in InfoAsset Manager

    4 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    MORE INFO NEEDED  ·  1 comment  ·  Hydraulic Model  ·  Flag idea as inappropriate…  ·  Admin →
  12. Update fields by SQL that reference files other than loaded GIS tables ie CSV

    Be able to update fields with data from external tables that don't reference primary InfoAsset fields ie Asset_ID, ID. Current SQL updates relly on input data being geocoded and user applying a spatial proximity.

    eg updating usertext1 with vaule from csv file where match is to a value in another user text field.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  SQL  ·  Flag idea as inappropriate…  ·  Admin →
  13. As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

    option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Network Tracing  ·  Flag idea as inappropriate…  ·  Admin →
  14. Add Additional Review Fields to Project Prioritization

    Project Prioritization is great step forward! However in future releases it'd be great to incorporate it further into an organization's CIP workflow. Specifically additional fields to specify whether a project has been reviewed, completed, in progress, etc.

    It'd also be useful to be able to be able to configure the naming of projects in IAP. Something different than just 1, 2, 3, 4, etc.

    Suggested by CDM Smith

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financial Planning  ·  Flag idea as inappropriate…  ·  Admin →
  15. direct import of MicroDrainage mdx files into InfoAsset Manager

    would like the ability to import MicroDrainage (MDX) files in to InfoAsset Manager, as per ICM, so asbuit developer proposals may be incorporated into collection networks to enable scheduling for survey/checks.

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  16. Autofill missing GIS assets based on PACP/MACP data

    When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as it has all of the necessary data to place these temporary assets. Having to get GIS just right (missing features, up/downstream manholes, etc.) to be able to import the inspection data can slow and if it fills in "dummy" assets based on the PACP/MACP data, you can quickly see where things are off between inspection data and GIS…

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  17. InfoAsset Planner - COF/LOF Wizard Pipe Inventory Table Join on Column other than FacilityID

    During "Step 3 - Set Parameter (Pipe Inventory)" I would like to be able to join the Internal/External table using an InfoAsset Planner column other than the "FacilityID". For example it would be great to also have the option of using the "LegacyID" to join the data however the COF/LOF is hard-coded to only accept the "FacilityID".

    It would be even better if any column could be used but that's probably not practicable given processing overhead and possible lack of data structure rules causing join errors. A handful of User Defined, ID columns would be great. These columns could then…

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  18. InfoAsset Planner - User Defined Scoring Range "Breaker" values in COF/LOF

    When selecting unique values in "Step 5 - Set Score Range" from within the COF/LOF wizard, it is not possible to add additional, user defined rows.

    I have a COF that scores a value from a table listing a severity as "Very Low", "Low", "Medium", "High" and "Very High" (scores = 1, 2, 3, 4 and 5), however, the data table does not have a row with "Low" as a rating. When the table is updated to include a row with a severity rating of "Low" the COF will not produce an accurate output since the value did not exist…

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  19. Update of underlying data model to be included as an option on the welcome screen

    Sitting in training with Orlando and Maggie and the question has been raised regarding the manual upgrade of the underlying data model. The statement that it is up to the user to update the data before commencing analysis but it is a manual task. A suggestion was that perhaps this update could be an option on the welcome/login screen

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  20. Info Asset Mobile Field

    When conducting a CCTV survey in Info Asset Field our crews add the related xml, video footage and photos which provide the results of the survey.

    In the capture form there is no option to add multiple files at once. Our CCTV crews are having to add one file at a time and having to navigate folders in order to find the required document as there is no 'drag and drop' option either.

    Crews can survey 32 to 50 lengths per survey in some instances which makes adding multiple files very time consuming, adding to the operational team admin time…

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Asset Condition  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1
  • Don't see your idea?

Feedback and Knowledge Base