Storm Sewer & Flood Modeling

Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.

This forum is the place to hear your ideas, feature suggestions, and feedback about our Stormwater, Sewer and Flood Modeling offerings.  For more information about these offerings, please visit: http://go.innovyze.com/Storm-Sewer-Flood

Please note that your ideas and comments posted here are visible to all other users.
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Support for multiple screens

    Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.

    58 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →

    We are investigating how this might be achieved, but initial indicators are showing that this is a very significant technical effort to complete so would need to be done over several releases.

  2. Directory structure on Workgroup Data Server

    We are working with more and more people, projects and countries on the same Workgroup Data Server, as the cost of a new server for each country are quite high. Unfortunately, there is no way to somehow make a directory structure on the Workgroup Data Server so we can arrange things by country for example. For now, a country prefix in front of a project works, but with hundreds of projects on the server this is not optimal.

    47 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  3. Validation as a background task

    Validation as a background task so UI isn't locked.

    33 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →

    We have spent quite a bit of time investigating how validation improvements might be achieved, whether that be through validation as a background task or whether it be with improvements on the speed of validation in the first place.

    There is no silver bullet which has been identified so far, the validation is already very efficient with minimal potential for speed improvements and there are issues with it as a background task as previously mentioned which we haven’t got fully fledged solutions to yet.

  4. Excel autosum and average in the Grid window

    It would be useful to get an autosum of a selection in the grid window at the bottom of the screen in much the same way Excel does. I know this can be done using the Overview function. But would be quicker and easier if it appeared in the panel at the bottom. i.e. if I was to select the population of a few subcatchments I would quickly be able to see the population. Perhaps also, if I changed scenarios I might be able to view changes in population between growth scenarios. Not essential, but nice to have.

    32 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  5. License management functions

    As ICM is fundamentally a workgroup environment, so shared across multiple offices and multiple users, we need to be able to understand license usage of user interfaces and simulation engines. We need ICM to log usage so we can then develop tools to interpret that information or build this into ICM so we can see usage. We often have instances when users cannot get licenses but there is no way to log this so we can establish a business case for purchasing more licenses. Similar with simulation engines we need to be able to report usage to demonstrate the need…

    28 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →

    We are looking at licensing improvements which can be leveraged, we might not be able to get all the specific information requested but are looking to make improvements which would help drive a better understanding of the seat utilisation.

  6. rectangular flap valve

    To avoid endless work around discusions on how to model a rectengular flap valve when only circular flap valves can be implemented in a model, having the option to model with rectangular flap valves would be verry usefull.

    28 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →
  7. 27 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  8. 24 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  9. Partially complete a simulation and review results and then opt to continue the simulation

    Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to completion.

    24 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →

    The approach which we are looking to leverage here is one which deviates a little from the original request but gives the same ability to interrogate results part way through a simulation. After investigating options, the best appears to be to have a run for the total duration you are interested in, then set a state saving checkbox in the run and when you wish to interrogate simulation results stop the simulation. We will then make use of ICMLive developed concatenation of results to allow us to tie in the “continuation run” with the results which were stopped earlier. There is a lot more detail to this than I can add here, but it should meet the need.

  10. Adjust mesh locally without remeshing all

    Adjust mesh locally without having to remesh the entire 2D zone.

    24 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  2D Flooding  ·  Flag idea as inappropriate…  ·  Admin →

    We are looking into this, but for the majority of cases it might be that there is already a significant improvement related to this with the new “Clip meshing” which was released with version 11.0 of the software, but in a prototype state, please ensure outputs are reviewed before use. The reason it provides an improvement is that it does a coarse mesh first (which is likely to remain unchanged if only small amendments are made) and follows this with a more detailed mesh after. It would be great to get any feedback you might have on your experiences with the Clip meshing and consistency of results.

  11. 22 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Flag idea as inappropriate…  ·  Admin →
  12. Use ruby to edit rainfall dialogue box

    Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.

    22 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  13. Set up runs more efficiently

    Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed.

    Model Name
    Base Model

    Rainfall Inflow WWG Tradeflows
    M5-30 Inf-M5-30 WWG1 Trade1
    M5-240 Inf-M5-240 WWG1 Trade1
    M5-960 Inf-M5-960 WWG1 Trade1
    M10-30 Inf-M10-30 WWG1 Trade1
    M10-240 Inf-M10-240 WWG1 Trade1
    M10-960Inf-M10-960 WWG1 Trade1

    With same timesteps and 2D parameters?

    21 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  14. Save toolbar and screen configurations and locations

    I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens.

    For example, on my external monitor there is enough room to have the User Actions toolbar displaying, but my laptop is smaller and there is no longer enough room for it, so instead of two rows it bumps down to three and moves my toolbars all around. Adding in profiles or even a scrollable space for the toolbars so the ones to the…

    21 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  15. RDII Analyst (in ICM)

    Provide RDII Analyst without needing to purchase InfoSWMM

    21 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →
  16. Integrate a Template option for setting out run group in Infoworks ICM

    I am working on project which includes 50 models. where we have to give runs for different return periods and durations for each model. It is a time taking process, which unnecessarily create chances of error by creating run setup every time. is it possible to include a run set up template, which can be changed as per the user requirement and saved for the further use.?

    20 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  17. Additional keyboard shortcuts

    Keyboard shortcuts can really help speed up processes and workflows in InfoWorks ICM but some of the menu options do not yet have these. Would it be possible to add the missing keyboard shortcuts, specifically for repeatable tasks such as updating objects from ground models?

    18 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  18. RTC rule themes

    It would be great if it was possible to theme in the GeoPlan on the basis of the rules which are active for a given object at the visible timestep.

    17 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Visualization  ·  Flag idea as inappropriate…  ·  Admin →
  19. Statistic Report Batch Processing

    As a use the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and prevents any other operation from been undertaken. This is highly inefficient and costly especially when optioneering if several iterations are needed. Shorter TSR's can be run in this case however even a year with several CSO's can take 20-30mins.

    15 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  20. AutoCAD DWG Background

    As a user, I would like to have AutoCAD drawing files as a part of my map control (InfraWorks ICM background) so I can see my AutoCAD Civil 3D design.

    15 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3 4 5 10 11
  • Don't see your idea?

Feedback and Knowledge Base