Skip to content

Storm Sewer & Flood Modeling

Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.

This forum is the place to hear your ideas, feature suggestions, and feedback about our Stormwater, Sewer and Flood Modeling offerings.  For more information about these offerings, please visit: http://go.innovyze.com/Storm-Sewer-Flood

Please note that your ideas and comments posted here are visible to all other users.
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

298 results found

  1. 28 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Additional keyboard shortcuts

    Keyboard shortcuts can really help speed up processes and workflows in InfoWorks ICM but some of the menu options do not yet have these. Would it be possible to add the missing keyboard shortcuts, specifically for repeatable tasks such as updating objects from ground models?

    28 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  4 comments  ·  Productivity  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. 26 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Save toolbar and screen configurations and locations

    I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens.

    For example, on my external monitor there is enough room to have the User Actions toolbar displaying, but my laptop is smaller and there is no longer enough room for it, so instead of two rows it bumps down to three and moves my toolbars all around. Adding in profiles or even a scrollable space for the toolbars so the ones to the…

    26 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Productivity  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. RTC rule themes

    It would be great if it was possible to theme in the GeoPlan on the basis of the rules which are active for a given object at the visible timestep.

    25 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Visualization  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Use ruby to edit rainfall dialogue box

    Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Inverse Distance Weightage in ICM

    We have Thiessen in ICM. It will be great if we have IDW like what we have in RS.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Rainfall  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. RDII Analyst (in ICM)

    Provide RDII Analyst without needing to purchase InfoSWMM

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Hydraulics  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Statistic Report Batch Processing

    As a use the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and prevents any other operation from been undertaken. This is highly inefficient and costly especially when optioneering if several iterations are needed. Shorter TSR's can be run in this case however even a year with several CSO's can take 20-30mins.

    23 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  4 comments  ·  Reporting  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Remove Need to Validate When Changing Background Layers

    Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when I don’t recall changing anything.

    22 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Productivity  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Our clients would like to see InfoWorks ICM apply daylight savings time corrections to wastewater and tradewaste inflows

    As a toggle setting in the run settings or in a wastewater/tradewaste pattern, this would shift the diurnal patterns based on the simulation date and daylight savings time start/end dates instead of working on standard time all year long. Mathematically, this is really straightforward, but may require internal indexes (and warning messages?) for the DST start/end dates. It would also require something to turn this feature on and off as there are several areas that do not observe DST. This feature would help us more accurately predict combined sewer overflow volumes and durations where base wastewater flow has a significant…

    22 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Hydraulics  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. 'Find and Replace Flags' tool on multiple networks.

    As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more flags get added, which are now obsolete in our current specification leading to hundreds of flags in the masterdatabase. It is not practicable to use the find and replace flags tool on each network individually, if this feature was expanded to be able to use on multiple networks, it would make administering our model flags much…

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. AutoCAD DWG Background

    As a user, I would like to have AutoCAD drawing files as a part of my map control (InfraWorks ICM background) so I can see my AutoCAD Civil 3D design.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Data Exchange  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Support for more than two simulations in long sections

    When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.

    20 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Model results as TVD connectors

    We'd like to have model results as an input in the TVD connectors. An example is where we have observed flows that we would like to use at a tributary and then switch to catchment flows when the observations run out. We know this can be done using a set up of sluices and dummy objects but it would be a lot more elegant to simply have the subcatchment as Input B. I'm sure there are plenty of other examples of where using model results as an input would be useful.

    19 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Live Modeling  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. 19 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Circular sluices/penstocks would also be useful

    Similar to the rectangular flap valve request, circular sluices would avoid workarounds trying to estimate the rectangular equivalent to a half closed circular penstock (or worse still a half closed egg shaped penstock)

    19 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Flow Survey importer

    It would be good to update the flow survey object and importer, giving this a more updated feel and removing some of the steps.

    19 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Calibration  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Use tracers for water on mesh elements

    Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. from existing objects like infiltration zones or roughness zones) we think we'll be able to better help our clients.

    18 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  2D Flooding  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Improve ground infiltration simulation parameters.

    Could we have a 'Node level affects groundwater infiltration' for the soil store please?
    This simulation parameter was introduced to InfoWorks ICM recently to limit infiltration from the ground store to the model. Could this be extended to limit flows from the soil store as well?
    As often when are using models for design purposes, infiltration can become excessive in design events compared to verification. Therefore we have to manually reduce soil store inflow, often requiring new limiting discharge orifices and nodes at each subcatchment with GI applied. Thanks

    18 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
← Previous 1 3 4 5 14 15
  • Don't see your idea?

Feedback and Knowledge Base