Storm Sewer & Flood Modeling

Welcome to the Innovyze Stormwater, Sewer, and Flood modeling feedback page.

This forum is the place to hear your ideas, feature suggestions, and feedback about our Stormwater, Sewer and Flood Modeling offerings.  For more information about these offerings, please visit: http://go.innovyze.com/Storm-Sewer-Flood

Please note that your ideas and comments posted here are visible to all other users.
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Simulation engine control update

    Since the beginning of ICM and allowing to send simulation to other computers in the network, there was a need for knowing exactly who is currently sending simulations and to which computer. Please update the ICM with this improved functionality for the normal user, not for admin only. These people are the ones who send simulation to the network, not IT people!

    13 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →

    Thank you for the addition of this request, we are in discussions about how this might be achieved as the level of awareness of tasks is varied between agents. Would a dashboard showing who sent which simulation where (which are still ongoing) be sufficient? This would be without the progress those simulations have already made available as a first step.

  2. Auto themes

    When themes are set and the upper and lower values for a set of themes have been defined, the auto themes button starts with the non linear interpolation between the minimum and maximum value, it would be great if this interpolation could initially be done linearly and if the other options came secondary to this.

    6 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  3. Lateral inflows from event data for rivers

    Currently it is possible to add lateral inflows to a river via subcatchments, if we could also do this directly from event data or TSDB that would be great.

    6 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  4. Infoworks ICM cross section

    Provide a function to easily assess cross sections of the ground model, similar to the XPSWMM function

    3 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  5. Infoworks ICM - Contours and Labels

    Infoworks - ICM

    Contours with labels to be shown on ground model

    3 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Visualization  ·  Flag idea as inappropriate…  ·  Admin →
  6. Only update interpreted points on Bank Line when updating from Ground Model

    When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the interpreted points, so they can be updated.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  7. 3 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  8. Dissolve river reaches into multiple river reaches

    It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite tool of the river reach merging tool). The two main applications for this are 1) If you need to connect a pipe to a river reach and you need to add a new node that will interpolate a new X-section somewhere and will cause the river reach polygon to be outdated, so you need to generate it again... it is…

    5 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  9. AutoCAD DWG Background

    As a user, I would like to have AutoCAD drawing files as a part of my map control (InfraWorks ICM background) so I can see my AutoCAD Civil 3D design.

    15 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  10. InfoSWMM from InfoSewer should allow the user to pick a scenario on import. It is a feature of InfoSWMM to convert an InfoSewer MXD and IE

    We only allow the user to import the active scenario in InfoSewer. If a user does not have InfoSewer then he or she must guess which is the active scenario. It would better to have a dialog to allow the user to import their selected and needed scenario.

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  11. Support for more than two simulations in long sections

    When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.

    8 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  12. Add support to the GIS Layer Control to access the new OS Open Data API's WMTS

    Enhance/Add support to the GIS Layer Control to access the new OS Open Data API's WMTS. It appears at the minute you can only add WMS layers.

    https://osdatahub.os.uk/

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Visualization  ·  Flag idea as inappropriate…  ·  Admin →
  13. Ground model inference rememebered

    When object entries are updated from ground model, it would be good if the previously used settings could be remembered the next time the dialog is triggered.

    5 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  14. 5 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  15. Transfer roughness values after cross section extension

    When a cross section is extended, the roughness values are not populated automatically when it is probably valid in a significant number of cases to carry forward the existing roughnesses of the cross section end points.

    5 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  River Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  16. Wide "Oval" shape ID

    conduit shape ID "Oval" only allows Height > With. So for "horizontally" wide oval conduits a new conduit shape has te be defined. It would be practical if the standard "Oval" also allows a with greater than the hight.

    4 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →
  17. I would like the option to model pump station that operate using VFDs.

    I would like to be able to enter the full and reduced speed pump curves for each pump station that is controlled by variable frequency drives. In addition, I would need the set point or control that causes the pumps to ramp up to full speed.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →
  18. Post processing scripts as part of a live simulation

    We need to be able to automatically run scripts at the completion of our forecasts. it would be extremely helpful if we could have these scripts as part of the manifest workflow so that they started as soon as the results export task completed.

    7 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Live Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  19. Merge radar and rain gauge data for accurate spatial rainfall assignment

    I would like to use radar rainfall like NEXRAD and spatially correct it to my rain gauge network locally before applying the rainfall in my model.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Flag idea as inappropriate…  ·  Admin →
  20. 2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base