Asset Management

Welcome to the Innovyze Asset Management feedback page.
This forum is the place to hear your ideas, feature suggestions, and feedback about our Asset Management Products and Solutions.  For more information about these offerings, please visit: https://www.innovyze.com/en-us/products/infoasset-overview

Please note that your ideas and comments posted here are visible to all other users.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. As an organization, we would like the ability to choose an alternative final risk calculation method.

    So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model.

    It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.

    12 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Criticality  ·  Flag idea as inappropriate…  ·  Admin →
  2. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    8 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  3. InfoAsset Planner - Allow Re-Ordering of Items in Operation Center

    Allow items in the Operation Center to be reordered; COFs, LOFs, Risks, Data Miners, etc.

    7 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

    The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP model reports the survival probability from the last break but not the time to the next break.

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Failure  ·  Flag idea as inappropriate…  ·  Admin →
  5. user defined boolean fields

    Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. Project Prioritization: Include multiple asset types in a single project

    Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. Basically Project Prioritization across asset types.

    Suggested by CDM Smith and others....

    4 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Financial Planning  ·  Flag idea as inappropriate…  ·  Admin →
  7. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  8. InfoAsset Planner - Validate Existence of CCTV Video Files

    I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys.

    I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since the video name in the .xml file does not match the saved video. A way to select CCTV surveys referencing invalid CCTV video files would be very helpful.

    This might be something that needs to be pre-processed on the InfoAsset Manager side of things but would be nice if InfoAsset Planner users could run the…

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Video Management  ·  Flag idea as inappropriate…  ·  Admin →
  9. InfoAsset Planner - Allow Renaming of Data Miners

    Allow Data Miners to be renamed in Data Miner.

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  10. View model results in InfoAsset Manager

    As a user I would like to be able to see hydraulic model results in InfoAsset Manager

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    MORE INFO NEEDED  ·  2 comments  ·  Hydraulic Model  ·  Flag idea as inappropriate…  ·  Admin →
  11. InfoAsset Planner for ArcGIS Pro

    As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?

    6 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  1 comment  ·  GIS  ·  Flag idea as inappropriate…  ·  Admin →
  12. CCTV Wizard output

    The CCTV wizard Geocode Pipe Survey Data function is great. As a user, I want the output pipe length of connection layer to be 10 feet or less instead of 15 feet, because we have mainlines are close and parallel to each other, currently the connection lines crossed two different mainlines and very confusing.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  13. direct import of MicroDrainage mdx files into InfoAsset Manager

    would like the ability to import MicroDrainage (MDX) files in to InfoAsset Manager, as per ICM, so asbuit developer proposals may be incorporated into collection networks to enable scheduling for survey/checks.

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  14. InfoAsset Planner - COF/LOF Wizard Pipe Inventory Table Join on Column other than FacilityID

    During "Step 3 - Set Parameter (Pipe Inventory)" I would like to be able to join the Internal/External table using an InfoAsset Planner column other than the "FacilityID". For example it would be great to also have the option of using the "LegacyID" to join the data however the COF/LOF is hard-coded to only accept the "FacilityID".

    It would be even better if any column could be used but that's probably not practicable given processing overhead and possible lack of data structure rules causing join errors. A handful of User Defined, ID columns would be great. These columns could then…

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  15. InfoAsset Planner - Create Sub Groups in Operation Center

    Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple, distinct steps.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  16. Update fields by SQL that reference files other than loaded GIS tables ie CSV

    Be able to update fields with data from external tables that don't reference primary InfoAsset fields ie Asset_ID, ID. Current SQL updates relly on input data being geocoded and user applying a spatial proximity.

    eg updating usertext1 with vaule from csv file where match is to a value in another user text field.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  SQL  ·  Flag idea as inappropriate…  ·  Admin →
  17. As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

    option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Network Tracing  ·  Flag idea as inappropriate…  ·  Admin →
  18. Export to extended TAB format

    Can extended Tab format be added so software compatible with x64 MapInfo and allowing export of Tab files greater than 2Gb

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  19. Automated exchange with CMMS System

    I want to use InfoAsset Planner on a (near) daily basis for optimizing O&M. The API connection to CMMS systems like Lucity and Cityworks is good but it still requires manually importing the data and manually creating work orders to send out.

    2 ways to improve this workflow:
    Automate the import of data from CMMS system
    Streamline the process to generate work orders from rehab plan

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Work Order  ·  Flag idea as inappropriate…  ·  Admin →
  20. As a user, I want to log CCTV import results and geocoding results

    In Infomaster, after importing CCTV inspections, it will popup a log text file and same as geocoding in CCTV wizard. But the log files are not available in InfoAsset Planner. Development team, please bring them over to Planner. Thanks!

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3
  • Don't see your idea?

Feedback and Knowledge Base