Asset Management

Welcome to the Innovyze Asset Management feedback page.
This forum is the place to hear your ideas, feature suggestions, and feedback about our Asset Management Products and Solutions.  For more information about these offerings, please visit: https://www.innovyze.com/en-us/products/infoasset-overview

Please note that your ideas and comments posted here are visible to all other users.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. As an organization, we would like the ability to choose an alternative final risk calculation method.

    So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model.

    It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.

    12 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  1 comment  ·  Criticality  ·  Flag idea as inappropriate…  ·  Admin →
  2. As a user, I would like the CCTV survey import tool to identify when the Pipe Segment Reference/Pipe ID is inaccurate.

    Currently, when importing CCTV inspection data, InfoAsset Planner looks for the inspection based upon Upstream and Downstream assets. If it finds a match, it does not check if the pipe segment reference/facility ID match as well. It only checks the pipe segment reference if a match is not found via US/DS IDs.

    Ideally, I would like the import tool to identify any case when the pipe segment reference does not match the GIS (in addition to identifying if the US/DS do not match). This would be beneficial because it helps ensure the quality of CCTV and GIS data. Survey and…

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Inspections  ·  Flag idea as inappropriate…  ·  Admin →
  3. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    8 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  4. InfoAsset Planner - Allow Re-Ordering of Items in Operation Center

    Allow items in the Operation Center to be reordered; COFs, LOFs, Risks, Data Miners, etc.

    7 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  5. As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

    The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP model reports the survival probability from the last break but not the time to the next break.

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Failure  ·  Flag idea as inappropriate…  ·  Admin →
  6. Display background networks in 3D view of IAM and ICM

    While considering design work, we want to see in 3D how new pipe layouts might conflict with the alternate systems (water supply, sewer, storm, etc.).
    On the map we can overlay colleciton networks, distribution networks, etc., but they don't show up in 3D. This would help us assess spatial conflicts.
    (This request came from our Water Talk)

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  7. as a distributor, i would like to have the complete function of risk in planner into manager.

    planner is much more complete process and easy to help the client to get the final work plan, while manager is more about managing the data and much powerful to managing the data. adding the funciton of planner, will make manager much more attrative and practial to use and easy to sell.

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  8. user defined boolean fields

    Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  9. Project Prioritization: Include multiple asset types in a single project

    Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. Basically Project Prioritization across asset types.

    Suggested by CDM Smith and others....

    4 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Financial Planning  ·  Flag idea as inappropriate…  ·  Admin →
  10. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  11. InfoAsset Planner - Validate Existence of CCTV Video Files

    I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys.

    I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since the video name in the .xml file does not match the saved video. A way to select CCTV surveys referencing invalid CCTV video files would be very helpful.

    This might be something that needs to be pre-processed on the InfoAsset Manager side of things but would be nice if InfoAsset Planner users could run the…

    4 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Video Management  ·  Flag idea as inappropriate…  ·  Admin →
  12. InfoAsset Planner for ArcGIS Pro

    As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?

    8 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  GIS  ·  Flag idea as inappropriate…  ·  Admin →
  13. Automated exchange with CMMS System

    I want to use InfoAsset Planner on a (near) daily basis for optimizing O&M. The API connection to CMMS systems like Lucity and Cityworks is good but it still requires manually importing the data and manually creating work orders to send out.

    2 ways to improve this workflow:
    Automate the import of data from CMMS system
    Streamline the process to generate work orders from rehab plan

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Work Order  ·  Flag idea as inappropriate…  ·  Admin →
  14. As a user, I want to log CCTV import results and geocoding results

    In Infomaster, after importing CCTV inspections, it will popup a log text file and same as geocoding in CCTV wizard. But the log files are not available in InfoAsset Planner. Development team, please bring them over to Planner. Thanks!

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  15. InfoAsset Planner - Allow Renaming of Data Miners

    Allow Data Miners to be renamed in Data Miner.

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  16. InfoAsset Planner - Data Miner Automation

    Data Miner Automation.

    As a user, I'd like to be able to call on and run other tools from the Data Miner. (i.e run pre-set analysis from the Analysis Tab - LoF, CoF, Risk, Rehab Plan, etc)

    This will allow me to create more complex analysis workflow. This way, I can be sure that prior analysis that I use as input later down the workflow are refreshed. This will also let me do everything from one spot without toggling between the tools and running them one by one to get to the result.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  17. View model results in InfoAsset Manager

    As a user I would like to be able to see hydraulic model results in InfoAsset Manager

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    MORE INFO NEEDED  ·  2 comments  ·  Hydraulic Model  ·  Flag idea as inappropriate…  ·  Admin →
  18. CCTV Wizard output

    The CCTV wizard Geocode Pipe Survey Data function is great. As a user, I want the output pipe length of connection layer to be 10 feet or less instead of 15 feet, because we have mainlines are close and parallel to each other, currently the connection lines crossed two different mainlines and very confusing.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  19. InfoAsset Planner - Create Sub Groups in Operation Center

    Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple, distinct steps.

    3 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  20. CoF and LoF Score Bubble Scale

    Our maximum score for both CoF and LoF is only a 5, but the CoF and LoF bubbles in the Facility Explorer appear to be default set at 10. At a glance, it is very confusing to most people who aren't engrossed in the model. We would like the ability to set the max score for these bubbles to be a 5 so that they are graphically shown properly.

    2 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3
  • Don't see your idea?

Feedback and Knowledge Base