Asset Management

Welcome to the Innovyze Asset Management feedback page.
This forum is the place to hear your ideas, feature suggestions, and feedback about our Asset Management Products and Solutions.  For more information about these offerings, please visit: https://www.innovyze.com/en-us/products/infoasset-overview

Please note that your ideas and comments posted here are visible to all other users.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    8 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  2. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    5 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  3. Detailed Risk Report

    We would like the ability to export a PDF report for a selection of pipe segments to include a map of each segment and all of the CoF and LoF detailed scores and values (i.e. the distance from water bodies and its CoF score).

    1 vote
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  4. Calendar View of Work in Manager and Online

    As a user I would like to be able to view the schedule of work showing status for each work crew. Similar to what is presented in InfoAsset Mobile

    0 votes
    Sign in
    (thinking…)
    Sign in with: Google
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base