Asset Management

Welcome to the Innovyze Asset Management feedback page.
This forum is the place to hear your ideas, feature suggestions, and feedback about our Asset Management Products and Solutions.  For more information about these offerings, please visit: https://www.innovyze.com/en-us/products/infoasset-overview

Please note that your ideas and comments posted here are visible to all other users.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. As an organization, we would like the ability to choose an alternative final risk calculation method.

    So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model.

    It would great if the user could choose the maximum score from all COFs or LOFs used in the particular risk model. Further, a button that reports the source of the score would be helpful in tracking and documenting the source of that dominant COF/LOF.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  1 comment  ·  Criticality  ·  Flag idea as inappropriate…  ·  Admin →
  2. InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

    Allow the Analysis Run to recalculate precedent Analyses before running itself.

    I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not necessarily be up to date. This means that the COF must be updated manually, the Data Miner must be updated manually, and the the subsequent COF must be updated. More importantly the dependency tree must be remember by the user or the data could be erroneous.

    Same problem when running Data Miners that reference preceding Data Miners or reference Analyses…

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  3. InfoAsset Planner - Allow Re-Ordering of Items in Operation Center

    Allow items in the Operation Center to be reordered; COFs, LOFs, Risks, Data Miners, etc.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. As a user, I would like the CCTV survey import tool to identify when the Pipe Segment Reference/Pipe ID is inaccurate.

    Currently, when importing CCTV inspection data, InfoAsset Planner looks for the inspection based upon Upstream and Downstream assets. If it finds a match, it does not check if the pipe segment reference/facility ID match as well. It only checks the pipe segment reference if a match is not found via US/DS IDs.

    Ideally, I would like the import tool to identify any case when the pipe segment reference does not match the GIS (in addition to identifying if the US/DS do not match). This would be beneficial because it helps ensure the quality of CCTV and GIS data. Survey and…

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Inspections  ·  Flag idea as inappropriate…  ·  Admin →
  5. As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

    The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP model reports the survival probability from the last break but not the time to the next break.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Asset Failure  ·  Flag idea as inappropriate…  ·  Admin →
  6. user defined boolean fields

    Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  7. InfoAsset Planner - Allow "Batch Run" in Data Miner

    Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run).

    At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically opened report in Dashboard (or ignore and click on Operation Center tab), repeat.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  8. InfoAsset Planner - Validate Existence of CCTV Video Files

    I would like to be able to validate the existence of CCTV survey videos linked to CCTV Surveys.

    I have found a CCTV survey that has an invalid "Media_Label". In this case I believe the .mpg file was renamed after the survey was submitted since the video name in the .xml file does not match the saved video. A way to select CCTV surveys referencing invalid CCTV video files would be very helpful.

    This might be something that needs to be pre-processed on the InfoAsset Manager side of things but would be nice if InfoAsset Planner users could run the…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Video Management  ·  Flag idea as inappropriate…  ·  Admin →
  9. Autofill missing GIS assets based on PACP/MACP data

    When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as it has all of the necessary data to place these temporary assets. Having to get GIS just right (missing features, up/downstream manholes, etc.) to be able to import the inspection data can slow and if it fills in "dummy" assets based on the PACP/MACP data, you can quickly see where things are off between inspection data and GIS…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  10. View model results in InfoAsset Manager

    As a user I would like to be able to see hydraulic model results in InfoAsset Manager

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    MORE INFO NEEDED  ·  1 comment  ·  Hydraulic Model  ·  Flag idea as inappropriate…  ·  Admin →
  11. Integration with Power BI

    As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Software Integration  ·  Flag idea as inappropriate…  ·  Admin →
  12. Videos in the Cloud

    As a user I would like to be able to upload and store videos in the Cloud and view them in InfoAsset Manager and Online

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DISCUSSION  ·  0 comments  ·  Video Management  ·  Flag idea as inappropriate…  ·  Admin →
  13. Create a COF/LOF utilizing an Upstream/Downstream Trace

    I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Consequence of Failure  ·  Flag idea as inappropriate…  ·  Admin →
  14. Play Sewer TV a standard multipliers (2x, 4x, 10x)

    I want to use standard video scaling multipliers to rapidly view inspection videos.

    Suggested video multipliers 2x, 4x, 10x faster than the recorded speed.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Inspections  ·  Flag idea as inappropriate…  ·  Admin →
  15. Project Prioritization: Include multiple asset types in a single project

    Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. Basically Project Prioritization across asset types.

    Suggested by CDM Smith and others....

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Financial Planning  ·  Flag idea as inappropriate…  ·  Admin →
  16. InfoAsset Planner - Allow Renaming of Data Miners

    Allow Data Miners to be renamed in Data Miner.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  17. InfoAsset Planner - Create Sub Groups in Operation Center

    Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple, distinct steps.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  18. Update of underlying data model to be included as an option on the welcome screen

    Sitting in training with Orlando and Maggie and the question has been raised regarding the manual upgrade of the underlying data model. The statement that it is up to the user to update the data before commencing analysis but it is a manual task. A suggestion was that perhaps this update could be an option on the welcome/login screen

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  19. LOF and COF by intersection tool

    The intersection tool within InfoMaster / Infoasset planner requires a specific buffer distance. It appears that it takes the worst case scenario within this buffer distance as opposed to the closed point to it. It would be nice to add a check box as to whether you'd like the data to be joined from the closest point within the buffer distance or the worst value within the buffer distance.
    For example, if I have a point feature class with available fire flow deficiencies and try to perform a LOF by intersection and apply a buffer distance of 200ft, it looks…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Probability/Likelihood of Failure  ·  Flag idea as inappropriate…  ·  Admin →
  20. As a user, I want to log CCTV import results and geocoding results

    In Infomaster, after importing CCTV inspections, it will popup a log text file and same as geocoding in CCTV wizard. But the log files are not available in InfoAsset Planner. Development team, please bring them over to Planner. Thanks!

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3
  • Don't see your idea?

Feedback and Knowledge Base