Asset Management
-
Export to extended TAB format
Can extended Tab format be added so software compatible with x64 MapInfo and allowing export of Tab files greater than 2Gb
1 vote -
Rehabilitation Plan Analysis Result Parameter
To better manage our assets from structural and maintenance perspective, our organization created two decision trees and set up two different rehab plans. As a user, I want to add the draft rehab plan layer as part of the Analysis Result parameter and user can select different draft rehab plan layer instead of the default output layer only.
1 vote -
CCTV Wizard warning default value
The CCTV wizard is one of my favorite tools in InfoAsset Planner, but it's very time consuming to run it manually. As a user, I would like to set the Give a warning when defect distance exceeds total length 1 feet as default value instead of 5 feet, so I can have it rerun silently.
1 vote -
Detailed Risk Report
We would like the ability to export a PDF report for a selection of pipe segments to include a map of each segment and all of the CoF and LoF detailed scores and values (i.e. the distance from water bodies and its CoF score).
1 vote -
Set Up and Run a Multi-Parameter on Top of a Multi-Parameter
We would like the ability to set up and run a multi-parameter on top of another multi-parameter. This will eliminate a LOT of outside Excel and GIS work and allow us to calculate these particular CoFs and LoFs all within InfoAsset Planner.
1 vote -
Add Additional Review Fields to Project Prioritization
Project Prioritization is great step forward! However in future releases it'd be great to incorporate it further into an organization's CIP workflow. Specifically additional fields to specify whether a project has been reviewed, completed, in progress, etc.
It'd also be useful to be able to be able to configure the naming of projects in IAP. Something different than just 1, 2, 3, 4, etc.
Suggested by CDM Smith
1 vote -
direct import of MicroDrainage mdx files into InfoAsset Manager
would like the ability to import MicroDrainage (MDX) files in to InfoAsset Manager, as per ICM, so asbuit developer proposals may be incorporated into collection networks to enable scheduling for survey/checks.
1 vote -
InfoAsset Planner - User Defined Scoring Range "Breaker" values in COF/LOF
When selecting unique values in "Step 5 - Set Score Range" from within the COF/LOF wizard, it is not possible to add additional, user defined rows.
I have a COF that scores a value from a table listing a severity as "Very Low", "Low", "Medium", "High" and "Very High" (scores = 1, 2, 3, 4 and 5), however, the data table does not have a row with "Low" as a rating. When the table is updated to include a row with a severity rating of "Low" the COF will not produce an accurate output since the value did not exist…
1 vote -
Info Asset Mobile Field
When conducting a CCTV survey in Info Asset Field our crews add the related xml, video footage and photos which provide the results of the survey.
In the capture form there is no option to add multiple files at once. Our CCTV crews are having to add one file at a time and having to navigate folders in order to find the required document as there is no 'drag and drop' option either.
Crews can survey 32 to 50 lengths per survey in some instances which makes adding multiple files very time consuming, adding to the operational team admin time…
1 vote -
Info Asset Mobile Field
When our CCTV crews are using Info Asset Mobile Field for a CCTV survey capture, they are often surveying multiple lengths (recent example 32 runs).
The teams are presented with a data capture form per length and each form has to be completed and closed for the survey data to be passed back to Info Asset Manager.
This is very time consuming and adding a considerable amount of additional admin time into each survey.
Please can you review the CCTV capture form and find a way that the entire job can be captured in one form that could relate to…
1 vote -
Support for Prompt SQL queries in InfoAsset Online
As a user I want to be able to run an SQL that prompts an InfoAsset Online user to enter a value such as a date range
1 vote -
Incidents as polygons rather than just points
As a user I want to be able to represent incidents like pollution spills or flooding events as a polygon extent
1 vote -
InfoAsset Mobile Report Templates
As a user I would like Innovyze to provide me with some InfoAsset Mobile reports when I install the software
1 vote -
Updating InfoAsset Planner with InfoAsset Manager
As a user I would like to be able to build an InfoAsset Planner system using my data in InfoAsset Manager
1 vote -
User Defined Asset Creation
As a user I would like to be able to be able to create user defined assets from an imported XML file
1 vote -
display labels associated with user text or number fields to enable bespoke information
configure InfoAssetOnline themes to be able to display labels associated with user text or number fields to enable bespoke information to be displayed or the likes of RPA
0 votes -
Calendar View of Work in Manager and Online
As a user I would like to be able to view the schedule of work showing status for each work crew. Similar to what is presented in InfoAsset Mobile
0 votes
- Don't see your idea?