Water Distribution

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Consistency in Plots Titles for Simulation and Live Data Plot Reports

    Consistency in Plots Titles for Simulation and Live Data Plot Reports

    In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011”
    Could it be made consistent and for the Simulation report to include both ‘Asset ID’ and ‘Node ID’ so plot titles are the same across different graphs components.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  2. I want to be able to customize the minor loss table for pipe networks.

    It would be nice if the user could modify the minor loss table for pipes. Whether it be changing the minor loss values, deleting, or editing the existing values. Since we all have our own resource we typical reference for these values, it would be nice to import those values and have that database saved in Infowater to make it easy to add all bends, etc. while building a model.

    Thanks!

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Operational Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  3. Allow decimals in number of properties assigned to customer points

    When setting up future demand scenarios we are often provided increase in population over an existing area of the network, reflecting infill growth across the area. However we can't distribute this across existing customer points because only a whole number of properties can be assigned to each customer point.

    Demand scaling could be used for this but has a number of drawbacks:
    - To use demand scaling we need to change the area code to reflect development areas, which means we can't use area codes to analyse DMAs.
    - It also means the demand statistics for a network does not…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  4. CAM Enhancement

    CAM Enhancements

    A few things to consider that I think would make your tool better than others I have seen/used:

    1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in your software
    2. The ability to export the other results to GIS like closed elements, isolated junctions, etc… into GIS.
    3. The ability to identify the number of customers (i.e. meters) and the number of critical customers (i.e. meters) isolated for each pounded area. This would require a GIS point layer with meters associated with pipes and…
    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  5. Time varying initial water age profile

    As a user it would be great to be able to add a time varying initial water age profile for transfer nodes. This would allow us to assess water age within the distribution network without having to combine models.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Water Quality  ·  Flag idea as inappropriate…  ·  Admin →
  6. Sort selection sets/ re-order them

    Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  7. Sorting 'Live Data Points’ by "Finish Date and Time" column

    Sorting 'Live Data Points’ by "Finish Date and Time" column

    In ‘Live Data Points’ tab it is not possible to sort items by grey fields such as "Start Date and Time" or "Finish Date and Time".
    I want to sort on "Finish Date and Time" so that assets with missing or old data are on the top of the list and can be investigated. If possible even if it is temporary data refreshed upon linked with Pi could sorting be added? If not sorting option should be disabled on columns that are not possible to use.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Telemetry  ·  Flag idea as inappropriate…  ·  Admin →
  8. I want to be able to put be able to customize what shows up in "pipes to flush" box

    Would like to be able to use any attribute within feature class in "pipes to flush" box so that can be easier to customize and communicate with field team

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Water Quality  ·  Flag idea as inappropriate…  ·  Admin →
  9. InfoWater: Report volume stored in tanks

    I can calculate volume from level, but it's an extra step and requires that I copy the run results out to Excel. It's even more difficult if I have a non-circular tank. Please include tank volume in the tank results and in the "System Demand" report.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  10. Option to display in the same time assignments of properties to nodes and to pipes

    Add an option to map to display in the same time assignments of properties to nodes and to pipes. At the moment it is not possible as the 'Customer Point Demand Assignment' option is a radio button.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Engine  ·  Flag idea as inappropriate…  ·  Admin →
  11. Automatically Generate System Curves in Infoworks WS Pro

    In InfoWorks WS Pro - A way to automatically generate a system curve for a pump would be extremely useful.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Operational Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  12. Extend flexibility in displaying information associated to HGL profiles

    As an InfoWater user I'd like to be able to add more information to my HGL profile, including nodal pressure, pipe diameter, flow, velocity, etc. I'd like see max/min level achieved throughout the simulation and have the ability to quickly add pipes to profile

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  13. More characters for flags

    Having a 2 character flag limit in WS pro can be a bit limiting especially as other packages have more characters (ICM has 3 etc.)

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Engine  ·  Flag idea as inappropriate…  ·  Admin →
  14. Initial Tank Levels

    It would be great to be able to change the initial tank levels without having to create a whole new tank data set or putting a duplicate tank in the current data set. That way, the initial tank level condition can be changed for any given scenario without having to worry about changes in tank geometry across all scenarios. I believe WaterGEMS allows you to do this so it would be great to see this functionality in InfoWater. Perhaps initial tank levels could be placed under the Initial Node Status controls?

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  3 comments  ·  Operational Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  15. Head Units

    In WS Pro it would be useful to be able to set the units for head in m AD. This used to be an option in WS. It can be confusing for people starting in or not familiar with modelling to differentiate between pressure and head and having this option would really help.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  16. I want to be able to see what connected Agents are doing and trouble shoot connections from within WS Pro

    A command centre program for WS Pro/IWLive runs which shows connected agents and marshallers and all the runs in a simulation workgroup in one place.
    Better simulation workgroup diagnostics.

    I am trying to trouble shoot remote VPN issues and the IT guys don't understand what WS Pro is doing and Innovyze think it is VPN/firewall issues. Very hard to resolve as the issue is hard (impossible) to diagnose from within the software. The Marshaller can see all the remote agents, but is unable to send a sim to them over VPN. This worked fine when we were all onsite but…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  17. water age - representing re-chlorination station by resetting age to 0 hrs

    Depending on the size of the distribution/reticulation system water is often chlorination at the WTP and re-chlorinated at various locations within the network.

    There is no way to reset the water age value at a reservoir or node etc. to represent a re-chlorination station. This makes it difficult to get an idea of the age of water in the reticulation since passing the last re-chlorination station.

    Can this feature be added to the model?

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Water Quality  ·  Flag idea as inappropriate…  ·  Admin →
  18. I would like more informative error messages when trying to Change an ID

    I tried to change the ID for a pump, but I overlooked the “Target Element Type” dropdown, which was automatically set to junction.

    It took me a while to realize my mistake. It might be helpful to other users if the error messages/warnings (see below) were a bit more informative… I’d suggest something like “WARNING: Junction ID ‘P1240’ does not exist.” I think this would have helped me realize my error much sooner.

    WARNING: unable to change Junction ID from 'P1240' to 'P1241'.
    MESSAGE: no Junction ID was changed.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  19. Add ability to rename datasets, patterns, queries, etc

    1. Allow the "Change ID" tool to rename datasets, patterns, queries, etc.
    2. Make the "Change ID" window wider or resizeable to fit longer IDs.
    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
    RECEIVED  ·  Luca Serena responded

    Partially completed: “Change ID” window is now resizable. Functionality available from InfoWater Pro 3.5 Update 2. Target release data April 2021

  20. InfoWater for QGIS

    ArcMap and ArcGIS Pro are expensive and slow. QGIS is free and fast.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base