Water Distribution

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. display multiple scenario results on long section picks

    For long section picks on model runs showing the hydraulic gradients etc. it would be useful when carrying out scenario work to be able to display more than one set of run results - currently have to export to excel.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    ON ROADMAP  ·  0 comments  ·  Operational Modeling  ·  Flag idea as inappropriate…  ·  Admin →
  2. As a user, I would like an automated method to allocate demands from meter points through lateral polyline to pipelines.

    I need a way to allocate demand from a meter (point meter) to the pipe (polyline) based on the lateral connection (polyline) at end points.

    Keep in mind:
    The features might not snap nor connect to pipes

    19 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Automation  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base