Water Distribution

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Can you include scenarios in WS pro environment similar to ICM

    ICM got the capability of the scenario modelling within the single network. H2Omap also had the same capability. Any possibility of having the same capability in WS pro?

    30 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  2. Multi-thread simulations

    As a user I want to take advantage of multi-threaded CPUs to accelerate simulation intensive procedures (e.g. design calibration)

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  3. Import demand scaling using CSV file on WS PRO

    Please add the ability to import demand scaling using CSV file on WS PRO

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  4. Add ability to rename datasets, patterns, queries, etc


    1. Allow the "Change ID" tool to rename datasets, patterns, queries, etc.

    2. Make the "Change ID" window wider or resizeable to fit longer IDs.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
    RECEIVED  ·  Luca Serena responded

    Partially completed: “Change ID” window is now resizable. Functionality available from InfoWater Pro 3.5 Update 2. Target release data April 2021

  5. As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

    Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (27,000 lots) in Melbourne.

    The study explored the capabilities of the software to model the urban water cycle. It has identified some significant advantages to an integrated modelling approach, however there are some key limitations of the software and hardware which limit its future use.

    We have published a joint paper that discussed the need and the concept and that can be make available upon…

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  6. Add Max/Min HL/1000 Results

    Can't currently map Max HL/1000. This would be more efficient/useful in some cases than mapping Max HL (feet). If your model has many segments, it is possible that very high head loss areas will not be flagged if only the HL is available.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  7. Allow InfoWater to export simulation results in CSV format instead of DBF

    The option to "Export simulation results for external application" in InfoWater would be more useful if the results were exported as CSV files instead of DBF files. We regularly need to compare the results from multiple model scenarios. Microsoft PowerBI or Excel PowerQuery are great tools for importing and comparing large amounts of data and could streamline this process significantly. However, neither support importing directly from DBF files.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  8. Node Name Generation Default

    In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
    IN DISCUSSION  ·  Luca Serena responded

    The functionality is already provided with the Digitisation Template in WS Pro. Please confirm what enhancement are you suggesting. Thanks

  9. Add zoom to and map navigation ability in the report tables for InfoWater Pro

    I use both Bentley and Innovyze water modeling software and i have noticed that the Bentley software allows you to zoom to elements from the report tables and allows you to pan, click, review properties, etc. while the report table is open. It would be really nice if Innovyze could include a zoom to feature in the report tables (similar to what is already included in the DB editor), and allow the user to pan around in the map and click on elements while the report table is open.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  10. Be able to change the background colour

    In InfoWorks the background colour for the GeoPlan is white - it would be beneficial to change this colour to the users choice to make particular features stand-out more clearly in the GeoPlan view

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  11. Persistent Graphs in InfoWater/InfoWater Pro

    Stored graphs aren't that great. Why not just make graphs persistent? This is one area where competitors blow away InfoWater and InfoWater Pro. No contest.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  12. Make InfoWater windows and dialog boxes resizable

    Many windows in InfoWater/InfoWater Pro are not resizable, making it difficult to see long values.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  13. Sort selection sets/ re-order them

    Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  14. Add new run groups and move existing runs to these

    I’ve currently got one very big run group which should’ve really been split into several different ones.
    Is there a way to move around runs? In the explorer there’s only really the option to duplicate.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  15. Boundary trace toolbar shortcut

    I often use the boundary trace tool to understand the extent of a DMA/PMA. Currently, we have to go to Geoplan -> Tracing Tools -> Boundary Trace, and it would be a lot easier if it was available as a toolbar shortcut.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  16. Improvements to custom DB table fields


    1. Ability to modify the length of custom fields in the DB tables after they have been created. This is particularly a problem when you create a text field, but realize later it is too short. Another option would be to make the default text length 250 characters rather than 20.

    2. Better manager for custom fields. The user should be able to create a field once and choose which information DB tables to add it to. See example at link. https://ibb.co/CbFKnn2

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  17. Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

    Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel or GIS. The main frustration is that the “Standard” or “Design Fireflow” in the Output Report/Graph results are completely separate from other information related to the model elements. As an example, it would be nice to export all fire flow results for junctions alongside any custom fields made in the DB Editor for easy referencing.
    In short, instead of having three types of tables…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  18. New Feature is Active in All Scenarios Option (InfoWater/Pro)

    Add a tools/options option so when you add new features they will be active in all scenarios, instead of getting errors 100 times for every scenario you try to run where the features were not included originally. This would be especially useful when using Intelliselection.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  19. I would like more informative error messages when trying to Change an ID

    I tried to change the ID for a pump, but I overlooked the “Target Element Type” dropdown, which was automatically set to junction.

    It took me a while to realize my mistake. It might be helpful to other users if the error messages/warnings (see below) were a bit more informative… I’d suggest something like “WARNING: Junction ID ‘P1240’ does not exist.” I think this would have helped me realize my error much sooner.

    WARNING: unable to change Junction ID from 'P1240' to 'P1241'.
    MESSAGE: no Junction ID was changed.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  20. InfoWater for QGIS

    ArcMap and ArcGIS Pro are expensive and slow. QGIS is free and fast.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1
  • Don't see your idea?

Feedback and Knowledge Base