Water Distribution

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Can you include scenarios in WS pro environment similar to ICM

    ICM got the capability of the scenario modelling within the single network. H2Omap also had the same capability. Any possibility of having the same capability in WS pro?

    27 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  2. Allow Ctrl+C and Ctrl+V in InfoWater Pro

    I could always copy and paste attributes via simple keyboard commands (Ctrl+C and Ctrl+V) in classic InfoWater, but can no longer do that in InfoWater Pro. You can right click and select "Copy" or "Paste", but that takes longer. Bring back keyboard commands.

    8 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  3. Multi-thread simulations

    As a user I want to take advantage of multi-threaded CPUs to accelerate simulation intensive procedures (e.g. design calibration)

    22 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    IN DEVELOPMENT  ·  2 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base