Skip to content

Drainage Design

Welcome to the Innvoyze Drainage Design user feedback page.
This forum is the place to hear about your ideas, feature suggestions and feedback from using Innovyze tools for Drainage Design.
Please note that your ideas and comments posted here are visible to all other users.


  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

46 results found

  1. InfoDrainage - replace stormwater outline with DXF (or other similar file)

    Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only.
    Every project there seems to be need to replace an outline from another drawing (as architechtural desisns evolve). At teh moment have to re-set up the control each time this occurs.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. InfoDrainage - Time of entry to be called time of entry, not time of concentration

    Te has specific meaning in the UK when using the rational method (modified).
    Tc also has speific meaning (Te + sumTf).
    It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of concentration, which is very confusing.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Import/export of asset data to/from CSV

    DSD import/export for MicroDrainage exists but HydroWorks is now dead. A more generic import/export would be beneficial for exchange of information with other drainage simulation packages and with GIS systems for existing networks; something similar to the import/xport functins in ICM would be ideal.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Assess scenarios based on annual water balance (runoff, infiltration, evaporation)

    Assessment of the annual water balance is an important criteria to evaluate drainage design at neighbourhood level.
    Functionality to assess scenarios in a chart (similar to typical pre-urban vs. urban) would save time in GIS-postprocessing

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. manhole and pipe size files

    when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. to be able to change the default button in storm duration

    to be able to change the default button in storm duration so I can set up my own default settings

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Change the size / dimensions of multiple manholes at once

    MicroDrainage Network

    It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. "Copy to clipboard" alongside print/export on Microdrainage spreadhseet input/outputs

    Would greatly simplify the process of getting results/details from MD into a report, skipping a stage in the current process (Export to CSV/Excel - Open)

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Include SuDS Maintenance

    Add the ability to have a maintenance sheet in the print outs for SuDS structures.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Realistic Flow in SuDS structures

    Realistic flow through bioretention, permeable paving and other SuDS within hydraulic models.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydraulics  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Support Biodiversity net gain

    Support the ability to create a biodiversity metric for SuDS structures as per the Defra tool.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Status Bar to report more significant figures

    The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Link to InfoAsset Asset Management Software

    Add a link to take drainage design data into Innovyze's InfoAsset Asset Management Software to complete the cycle of design - build - manage - maintain cycle.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Enable drawnet manhole changes

    Enable the manholes assigned to impermeable areas on drawnet to be changed.
    It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save a lot of time.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Include Linear Drainage Channels

    Support a wider range of linear drainage channels.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Easier selection of FEH and FSR Rainfall in the "Seasonal Return Period Wizard"

    Sometimes we are required by the LLFA to run storms <60mins with FSR rainfall and storms >60mins with FEH rainfall. This requires the "Seasonal Return Period Wizard" to be run twice following changes to the network and then exported in separate files.

    It would be much quicker if this could be specified in the wizard.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Allow SOIL values < 0.15

    The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15.
    The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1
    This produces a significant difference in results. This difference results from using values of SOIL from FSR vs Wallingford Procedure and FSSR7
    It would be better if the MDSUDS tool allowed values of SOIL down to 0.1 for compatibility, and if the default values were standardised across the industry.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Hydrology  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Flood Studies Update: Ireland

    Add support for the Met-Eireann DDF Irish Rainfall Data. The IDF data can be downloaded from a website and automatically uploading this data would be a big time-saver for users in Ireland.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Print Tickbox for Manhole Schedule Layout option

    In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base