Drainage Design

Welcome to the Innvoyze Drainage Design user feedback page.
This forum is the place to hear about your ideas, feature suggestions and feedback from using Innovyze tools for Drainage Design.
Please note that your ideas and comments posted here are visible to all other users.


  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Clash detection between pipe networks

    Can wall thicknesses be added to pipes and manholes to check clash detections

    6 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  2. Run same return period with multiple climate change allowances

    When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the network multiple times to cover no CC, upper & lower CC limits.

    6 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    MORE INFO NEEDED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  3. Enable drawnet manhole changes

    Enable the manholes assigned to impermeable areas on drawnet to be changed.
    It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save a lot of time.

    4 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  4. Flood Studies Update: Ireland

    Add support for the Met-Eireann DDF Irish Rainfall Data. The IDF data can be downloaded from a website and automatically uploading this data would be a big time-saver for users in Ireland.

    4 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Rainfall  ·  Flag idea as inappropriate…  ·  Admin →
  5. Retain/Lock dummy MH names

    Can we get a function to lock/retain MH numbers, If you have multiple dummy MH's and need to make changes any name you have given to these is lost when renumbering. You then need to go through the whole process again.

    3 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  6. True Ground Profile on Long Section Exports

    It would be very useful if there was a way for the true ground profile to also be exported on long sections. Currently, when exporting long sections from microdrainage, the true ground levels are only shown at manhole locations and a straight line is used to replicate ground level between the manholes. Could a 3D terrrain file possibly be loaded into microdrainage so that the true ground profile is shown when exporting long sections?

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  1 comment  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  7. InfoDrainage - Apply urban creep to selected storms only

    Urban creep is an additional test which is not applicable to all runs. So would be more useful to not have a universal application of creep (to all storms). Would be better to have the facility to apply to selected storms only.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →
  8. InfoDrainage - Time of entry to be called time of entry, not time of concentration

    Te has specific meaning in the UK when using the rational method (modified).
    Tc also has speific meaning (Te + sumTf).
    It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of concentration, which is very confusing.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  9. Include SuDS Maintenance

    Add the ability to have a maintenance sheet in the print outs for SuDS structures.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  10. Tree Pits

    Add Tree Pits as a type of SuDS structure.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  11. Support Biodiversity net gain

    Support the ability to create a biodiversity metric for SuDS structures as per the Defra tool.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  12. Status Bar to report more significant figures

    The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  13. Print Tickbox for Manhole Schedule Layout option

    In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →
  14. Enable locking of pipe numbers

    One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once it's already been issued for construction you can't afford to change pipe numbers as it would be too confusing, which means that the 3D model can no longer match the Microdrainage model.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  15. Switch design return periods when running cascade analysis

    I would like to be able to build a single cascade model & able run it for various design return periods instead of needing to create separate cascade models for each return period.

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  16. Microdrainge to Revit

    Make Pipes and Inlet available in Revit

    2 votes
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    RECEIVED  ·  0 comments  ·  Data Exchange  ·  Flag idea as inappropriate…  ·  Admin →
  17. InfoDrainage - level bench in basin/pond configuration

    The sizing calculator in the pond build pop-up enables one side lpe only.
    There are now LLFAs that require level benck of at aleast 1.5 m width after 0.6 m depth in a basin.
    It is currently not possible to use your calculator to establish such basin properties.
    This would be useful.

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  18. Snap tool for areas

    Just like in CAD DrawNet you can use the CAD tools to snap the points of the catchment areas to specific points, it would be useful to have a snapping tool built into the MicroDrainage program. It could be a simple tool so you can either put a new point of the area anywhere, or when you're close to a point of another area you can snap to that point. This would save going back and forth between MD and CAD.

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Productivity  ·  Flag idea as inappropriate…  ·  Admin →
  19. Exceedance Level in Infodrainage

    It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level
    By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for our designs to have circa. 1m+ cover from top of tanks/soakaways etc to ground level.

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Design/Sizing Tools  ·  Flag idea as inappropriate…  ·  Admin →
  20. Manhole Schedule Numbering

    For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30.
    I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deepest, e.g. U/S to D/S. As is quite common in design additional MHs need to be incorporated further into the model due to clashes or change in direction etc, so it would be best if all outputs and MH tables followed the numerical order.

    1 vote
    Sign in
    (thinking…)
    Sign in with:
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Reporting  ·  Flag idea as inappropriate…  ·  Admin →