Clash detection between pipe networks
Can wall thicknesses be added to pipes and manholes to check clash detections
15 votesDear User,
Thanks for posting, commenting and voting for this idea. We have reviewed the requirements for implementing a clash detection tool in InfoDrainage, and this is currently in Development for future releases of the software.
As for the comments regarding the pipe thickness, we will enable customers to insert a tolerance value so users can account for both the pipe trench width/height and the pipe thickness when deciding the vertical and horizontal tolerance values.
Kind Regards,
InfoDrainage Product Management team
-
InfoDrainage - Permeable Paving
It would be useful to have a central granular conveyance trench beneath permeable paving to avoid the need for overly deep sub base beneath the road / drive.
8 votes -
Sewer Design - Depth to soffit
InfoDrainage currently has the depths shown as depth to invert when depth to soffit is more useful to ensure the sewer has sufficient cover
7 votesThank you for submitting, commenting and voting on this User-Voice idea. We have reviewed the requirements, and this is now on our roadmap for development for future releases of InfoDrainage.
-
Exceedance Level in Infodrainage
It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level
By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for our designs to have circa. 1m+ cover from top of tanks/soakaways etc to ground level.7 votes -
Tree Pits
Add Tree Pits as a type of SuDS structure.
7 votes -
Improved tutorial for setting up a network
InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullies.
when asked "was this page helpful" i put thumbs down, hoping to get a chance to say the above but i cannot type in the feedback form. please update chapter 2 "creating the network" so that new users can setup a simple network - all ive done is click buttons to load random data and do not feel like i…5 votes -
InfoDrainage - level bench in basin/pond configuration
The sizing calculator in the pond build pop-up enables one side lpe only.
There are now LLFAs that require level benck of at aleast 1.5 m width after 0.6 m depth in a basin.
It is currently not possible to use your calculator to establish such basin properties.
This would be useful.5 votes -
Velocity and proportional velocity to be shown on Tables
When designing sewers a critical design criteria is the pipe velocity when full or at design discharge rate. It makes designing sewers quite iterative without this included
4 votesThank you for the suggestion and thanks to those who commented and voted.
In order to get rid of the dendritic numbering system that was in MicroDrainage which prevented users from modelling bifurcation, we had to introduce the design wizard rather than an optimise button that looked at the whole system. This means that users will have to run a design wizard to check the velocities. However, we've introduced various flexibilities for turning on and off design criteria parameters which will make these iterations easier.
Does the above address your suggestion?
-
Infodrainage - Display Settings - Annotation Connections Slope
Infodrainage - Display Settings
Slope annotation in connections to be 1:x rather than shown as x(1:x)
4 votesThank you for the suggestion and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.
-
3 votes
Thank you for the suggestion, and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.
We are working on enhancing the long section, so it shows more data in the tables, and we made it flexible so users can select what to view. We are also working on annotating the Hydraulic Grade Line and the Energy Grade Line. This is now on our road map for future releases of InfoDrainage.
-
InfoDrainage - Time of entry to be called time of entry, not time of concentration
Te has specific meaning in the UK when using the rational method (modified).
Tc also has speific meaning (Te + sumTf).
It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of concentration, which is very confusing.3 votes -
Include Linear Drainage Channels
Support a wider range of linear drainage channels.
3 votes -
Need Papadaskis-Kazen Time of Concentration for Preliminary Sizing
The local requirement for Arizona require the use of Papdaskis-Kazen as the time of concentration method. Please add.
2 votesThank you for submitting and voting for this idea. We've received it and it will be reviewed for future consideration.
-
SuDS and Inlet Level sync stepdowns
Infodrainage 2023.2
Inlets into SuDS features need to be able to be different from the SuDS features bed level.
It is almost always necessary to have a step down between inlets and outlets on Ponds and Swales etc.2 votesThank you for the suggestion and thanks to those who commented and voted.
The inlet pipe will always try to sync to the bed level of your Storm Water Control (SWC), however, you can easily lock the pipe and manipulate the level so your inlet pipe can be higher and your outlet pipe can be lower. You can introduce inlet and outlet chambers and you will have full flexibility in dropping the levels as required.
Does the above address the issue?
-
Realistic ground profile for swales
This is a flaw that's been going since MicroDrainage, but when you change the type of a connection from a pipe to an open channel, like a swale, there's no information at all provided about the actual size of that feature.
I had one come in the other day, only attenuation on the whole site was in a swale. Parameters for the swale has been set 0.5m base width, 1:3 side slopes, Mannings n 0.03, everything normal and okay with this, right?
But the manholes at the top and bottom of the link that had been turned into the swale…
2 votesThank you for the suggestion and thanks to those who commented and voted.
If you try to build your swales using the SWCs rather than converting links to swales, you will see that you can start from the top area and go down (1:3) or you can start from the bottom and go up (1:3).
Does the above address your suggestion? I'd be interested to hear your thoughts once you try it.
-
Output Cv values
Cv values used to be set globally and would be output as part of the simulation criteria, so the values that were used were always visible in results files for LPA/LLFA officers to check that the model complied if a 0.9 or 0.95 Cv was requested as many authorities now do.
Now the Cv values are per catchment, so if I need to change them to suit an authority's requirements I have to do it manually on many items, and it's hard to output them to prove to the authority that I have followed their requirements.
It would be great…
2 votesThe report that is automatically generated by InfoDrainage has this detail when you tick Inflows (see screenshot attached). InfoDrainage will report on every subcatchment and detail what CV values have been used for summer and winter.
Does the above address your suggestion?
-
Fall column
Include a column in the connection design table that displays an editable 'fall' value, i.e. calculated value of US/IL - DS/IL, used to be a handy feature in MicroDrainage Network
2 votesThank you for the suggestion and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.
-
Mixed decimal place
I'm using InforDrainage 2023.1 and there are mixed numbers after decimal point. In profile view, there are five digit after decimal point which is unnecessary.
2 votesThank you for the suggestion and thanks to those who commented and voted. This is to confirm that we've received your suggestion and that it will be reviewed for future consideration.
-
manhole and pipe size files
when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file
2 votes -
to be able to change the default button in storm duration
to be able to change the default button in storm duration so I can set up my own default settings
2 votes